BPDB 50MW Faridpur Power Plant, Bangladesh
Client: Energypac Power Generation Ltd
Key Activates of the Project:
-
Grounding Systems (Grounding & Arial) Installation.
-
Balance of Plant (BoP) Electrical Works such as, Main electrical equipment installation, Main transformer erection, Auxiliary transformer, Station transformers, Start-up transformer, Emergency transformer, Lighting transformer & Black out generator installation, Instrumentation, Communication and security system installation, HT & LT switchgear panels, MCC panels, Control panels, Distribution board, UPS inverter, Battery charger, Diesel generator and all other kinds of equipment of the Plant, Cabling and termination of LV, HV, MV, Instrumentation & Control cables.
-
Erection of Boilers, Piping, Insulation & Painting.
-
Structural Support & Cable tray System.
-
Design, Supply & Installation of Raised Floor System.
-
Design, Supply & Installation of Fire & Sound Proof Door.
-
Assistance of Testing, Commissioning & Start-up.